2009, Spring. Carpenters at work. Barrel roof goes up.
In mid March, a design 'irregularity' was discovered and some re-working of the second floor roof had to be done. John, Keith and Jimmy had to re-do a lot of work, but it is a beautiful sight to see. Here are images of the roof work, and final shots of the barrel roof.
March 2009. All the roofs are up! Plastic on the ground is some stone work that Linda and Scot have begun. What follows are some shots of all that work in progress.
Jimmy and Keith (up high) discuss issues with John (on the ground.) Note the curved board above John's head. That will be where the barrel roof begins over the living room.
John Edmonson setting a ladder scaffold.
Closer shot of Jimmy and Keith at work up high.
Keith and Jimmy build the knee wall that will support the barrel roof.
Keith and Jimmy on the knee wall.
2X12s rest on the knee walls of the barrel roof in an early shot.
Knee wall and barrel roof framing.
Soffet sections go on the barrel.
Inside, looking up at the barrel roof.
View from the south with all the roofs up.
Closer shot of Jimmy and Keith at work up high.
Keith and Jimmy build the knee wall that will support the barrel roof.
Keith and Jimmy on the knee wall.
2X12s rest on the knee walls of the barrel roof in an early shot.
Knee wall and barrel roof framing.
Soffet sections go on the barrel.
Inside, looking up at the barrel roof.
View from the south with all the roofs up.