During the summer of 2010, we worked on the guest room, kitchen, entry way, and dining room cordwood.
Kitchen and entry way cordwood.
Monday, September 20, 2010
Tuesday, June 15, 2010
2010 June-August. Cob Wall construction
Cob is a mixture of clay, sand and straw. Worldwide, more homes are built of clay than any other material.
June 14, 2010: The floor on the first level is poured. Under the floor is 2.5 inches of rigid insulation that was headed for the landfill. This insulation will allow the floor to store heat in the winter, then radiate it back into the room at night. The floor will also keep the house cooler in summer.
June 2010: We began building a 20,000 pound cob wall that, like the floor, will provide thermal mass to store heat in winter, and cool in summer.
June 14, 2010: The floor on the first level is poured. Under the floor is 2.5 inches of rigid insulation that was headed for the landfill. This insulation will allow the floor to store heat in the winter, then radiate it back into the room at night. The floor will also keep the house cooler in summer.
June 2010: We began building a 20,000 pound cob wall that, like the floor, will provide thermal mass to store heat in winter, and cool in summer.
July 2010 weekend 2010: work continues. Niches and shelf take shape.
August 2010: the arches, electric boxes, and more glass go in. It's getting pretty tall.
Sept 2010, Labor Day Weekend. The wall nears the ceiling.
August 2010: the arches, electric boxes, and more glass go in. It's getting pretty tall.
Sept 2010, Labor Day Weekend. The wall nears the ceiling.
We will eventually put ceramic tile on the floor, but not for some time. The following photos illustrate the cob wall being built, curving out into this room, creating a sun room by the entry door. Most recent photos of cob work are at the end of this series, oldest first.
Click on any photo to enlarge.
Above, from the sun room... looking in.
In July, we continued the work:
In August with some new folks and some returning, veteran cob builders, we took it up even higher:
the wall is a bit higher on Saturday evening.
Labor Day 2010
Wednesday, March 31, 2010
2010, Cordwood begins. Earth roofs thrive.
First (rough) coat of lime plaster on straw is at left.
The window is from a Habitat for Humanity resale store, where surplus windows are sold for bargain prices. Bottles are for decoration and let in beautiful light.
The following photos are from summer 2010: