Sunday, September 13, 2009

2009, August/Sept:
Stone, Lime Plaster, and Living Roofs.


West end with first coat of lime plaster, taken from the northwest at the end of September, 2009.


West end at the end of Sept 2009... and a little surrounding mess!


Marty planting on the barrel roof, the 2nd earth roof.


Marty and Linda planting on the barrel roof.


Mike Parsons working on the dining room stone wall.



Mike's work on the south, entry wall.



Mali, Denali and Ankur applying lime plaster to the west wall.

Linda plastering the west wall. Note the early 'tree' being placed in the plaster.


The bedroom wall mid Sept 2009: This shows a couple of phases at once.... One side straw, the other with a first coat of lime plaster.


North wall of the living room with first layer of lime plaster.
The window hole is 4' X 5'.


Living room, south wall before plastering. (note the waterproof and drainage layers have been applied to the barrel roof.)


The same wall with a partial first layer of lime plaster. The window - facing south - is 5' X 5'. Now the roof has soil and burlap on it.


Denali and Mali beginning to plant on the guest room roof.
Note the curved fascia boards above Denali's head, and the lime plaster wall behind.


Denali planting some chives. Lime wall behind is scored in anticipation of another coat.


Mali planting some thyme.


The guest room fully planted, with lime plaster wall behind coated twice. Now we wait and see how it grows.

Mid September we had a small work party to haul soil up to the barrel roof. Billy, Linda, Ankur, and Mali on the roof while....

Drew, Liv, Lindsay, and Denali fill and hoist soil up.

Monday, August 10, 2009

2009, June and July:
Straw Bale and Lime Plaster

In June, 2009 the straw bales arrived. Then in June and July we had a number of work weekends in which many people came to help.... as well as to learn some straw bale techniques.

In mid-June, the 660 straw bales arrived.


Sigi demonstrates how to bevel a straw bale.


The first row of the living room arch goes up.


The second row of the living room arch goes up.


The third row goes up and the arch is secure!


Here are the workers around the finished arch!


Meanwhile, in the bedroom, there is discussion about the curved wall.


Work on the curved wall begins.


The curved wall as seen from the outside.


Todra, Jay and Denali get ready to lay the 4th course.


Two days hard work and most of the curve is done.


A couple weeks later it is done.... awaiting windows.


Paul and Paola work on a side wall that adjoins the bedroom curve.


Folks work on the back (stairwell) wall.

The living room walls around the arch are nearly done.
They await a 4X5 foot window.


Friends come to help us plaster a wall with lime plaster.


Applying lime plaster to the barrel roof....

... wasn't all work.

Sunday, March 15, 2009

2009, Spring. Carpenters at work. Barrel roof goes up.

In mid March, a design 'irregularity' was discovered and some re-working of the second floor roof had to be done. John, Keith and Jimmy had to re-do a lot of work, but it is a beautiful sight to see. Here are images of the roof work, and final shots of the barrel roof.

March 2009. All the roofs are up! Plastic on the ground is some stone work that Linda and Scot have begun. What follows are some shots of all that work in progress.


Jimmy and Keith (up high) discuss issues with John (on the ground.) Note the curved board above John's head. That will be where the barrel roof begins over the living room.


John Edmonson setting a ladder scaffold.

Closer shot of Jimmy and Keith at work up high.


Keith and Jimmy build the knee wall that will support the barrel roof.

Keith and Jimmy on the knee wall.


2X12s rest on the knee walls of the barrel roof in an early shot.


Knee wall and barrel roof framing.

Soffet sections go on the barrel.

Inside, looking up at the barrel roof.

View from the south with all the roofs up.


Sunday, March 1, 2009

2009, March. The Radial Roof goes up.

In late February John Edmonson and his crew of skilled carpenters put up the radial roof over the master bedroom. We had originally planned on covering the joist structure, but upon seeing the beauty of the radial work, we now plan on exposing the beams. Here are a few shots of it.

Linda standing under the radial roof, showing the radial design that will show in the bedroom.


Radial roof seen from the second floor guest room area.


The design as seen from directly below (where the bed will be.)


Structure as seen from up on the roof.

Wednesday, February 25, 2009

2009, Feb. Second Floor Posts and Beams. Roofs go up.

With spring 2009 around the corner, the house is making progress. Posts and beams are up on the second floor, a couple of roofs are on and we hope to begin placing stone by mid-late March. Here are some shots showing recent progress. Most of the lumber is certified as sustainably harvested.


After the floor joists were put in, the second floor posts went up.


Guest room roof goes on, with 2nd floor posts showing. The roof will be a green roof... later.


Curves require that each joist is a different length.


The 12X14 inch oak beam over the master bedroom. It is a beauty! A radial roof will go above.


The roof begins on the western end. This will be a green roof.


Second floor beams go up!

Second floor roof goes up!