In late winter we began to apply clay plaster to the inside walls.
March 19th we had a huge work weekend.
March 19th we had a huge work weekend.

putting a second coat in the bedroom.



Scot moved it all inside ahead of time, we put it together 'dry' to make sure there were no surprises, then mortared it all together the next day.
Marshall lifts a 125 pound block onto the unit. Easier alone than with Scot 'helping.'
Around December 23rd:
Then the door frame (with painter's tape to keep it clean) was anchored to the core, and cob went up the walls, .....
January 2011: The stone bench continues around the back,
The back, clean out door, with a heart shaped stone found in the woods.
With most of the primary cob work done.. from the back.
Most of the primary work done, from the front.
Upstairs it looks fairly normal except that is has no water tank. This will obviously help with water conservation.
In the basement, the elaborate composting unit. It will allow nearly two years of use without emptying.
Just over a day later, we have a major portion of the wall built!
Participants at the end of day two, behind the smaller of the two walls!
Everyone working hard while Linda takes the machete to the wall.
A closeup of the thick glass in the wall.
Paul, Lindsay and Paola (with Renata and Steve in the background) sift clay.
These guys are quality control?
At the end of the second weekend.... note the inlaid glass and marble.
Sarah, Jason, Linda and Ryan work on an arch. Note they are standing on bales, so the wall is taller than it may look.
The arched niches hold Vivian's freshly made blackberry juice!
Tom and Nomi finish off around electric boxes.
With the new, wet cob showing on top, you can see that
Jonathan working on an arch.
Josh and Lindsay work around some glass.
Ben and Leah pressing cob balls into the wall.
Linda and Jackie work near the door.
Billy working cob above the doorway.